A resolution authorizing additional maintenance/repair expense
BE IT RESOLVED BY THE BOARD OF directors of the sunny meadows Missoula county water and sewer district:
WHEREAS, the District has been utilizing the services of Brian Hensel as our contracted water operator; and
WHEREAS, the District has had an intermittent problem with the water system which may indicate a leak in a portion of the system; and
WHEREAS, continued positive coliform bacteria results in the system may cause the District to incur substantial additional expense; and
WHEREAS, Brian has indicated he may be able to detect the potential leak if he is allowed to spend time with detection equipment, but is reluctant to do so without explicit authorization; and
WHEREAS, the District would benefit strongly from this issue being resolved.
THEREFORE BE IT RESOLVED, that the District authorize Brian Hensel to spend up to 10 hours of billable time during calendar year 2011 in searching for the leak. Any time spent is to be billed at his standard rate of $48/hour to the District.
PASSED AND ADOPTED this 3rd day of February, 2011
Signed: _____
Name: Cynthia Winchell
Title: District President _____
Date: _____
Attested: _____